Irrigation and Drainage
Throughout the decades, Energoprojekt Hidroinzenjering has collected experience and knowledge in the field of irrigation and drainage works, on the Projects all over the world.
Energoprojekt Hidroinzenjering has prepared various designs of drainage and flood control systems, development of riparian areas, training and improvement of watercourses, erosion and sediment control.
Experts and professionals of Energoprojekt Hidroinzenjering can meet even the most complex challenges in the field of irrigation and drainage works.
North Nawin
Irrigation system in Prome district, with the area of 40,000 ha.
Garabulli
Project of reclamation of 32,000 ha of desert area and construction and equipping of 1000 farms. Water which is used for irrigation is pumped from 123 wells.
Chira-Piura Phase I
Project of the Chira River water transfer into the Piura River by means of 54.5 km long derivation canal for the irrigation of the middle and lower Piura regions. Drainage system covers the area of around 32,000 ha.
Badra-Jassan
System of desert area irrigation by using the Tigris River waters, desalination and drainage of the area of 22,300 ha.
Ibar-Lepenac
Multi-purpose hydro-system for water supply of industrial facilities, residential areas and irrigation for around 73,000 ha of farmland.
Chira-Piura Phase II
Projects of amelioration structures intended for increasing of agricultural production on around 30,000 ha in the Piura River valley and system expansion by additional 5,600 ha.
Tikvesko Polje
Irrigation system, covering the area of 20,000 ha.

