Wastewater
Energoprojekt Hidroinzenjering has been successfully dealing with the problems of waste water, stormwater collection and disposal, as well as the urban and industrial wastewaters treatment. Based on the designs prepared by its experts, 30 wastewater treatment plants have been constructed or their construction is in progress.
Apart from preparation of the investment and technical documents, Energoprojekt Hidroinzenjering has been providing special engineering-consulting services and majority of the wastewater treatment plants have been built as the integrated solution projects.
E-75 Highway
Stormwater collection and disposal system along E-75 highway stretch through Belgrade (Serbia) Open drainage canal in the length of 12 km (maximum discharge 3.5 m3/s) and two sumps with the capacity of 28000 m3, respectively.
Cacak
System for collection and disposal of stormwater and wastewaters for the town of Cacak (Serbia) Sewerage network (45 km) with 4 pumping stations (50-700 l/s), stormwater sewerage system (52 km).
Ha Potami Water Utilities
System for collection, channeling and treatment of waste waters from tourist area. Total length of sewerage network 19 km, with 8 pump stations.
Kragujevac
Treatment of municipal and pre-treated industrial effluents of the city of Kragujevac. Reduction of BOD to 20 g/m3 and suspended solids content to 30 g/m3. Water Plant capacity 1500 l/s (250000 PE).
Gornji Milanovac
Treatment of pre-treated industrial and municipal effluents of the city of Gornji Milanovac. Reduction of BOD to 20 g/m3 and suspednded solids content to 30 g/m3. Central plant capacity 100.000 PE.
Obrenovac
Treatment of pre-treated industrial and municipal effluents of the city of Obrenovac. Reduction of BOD to 20 g/m3 and suspednded solids content to 30 g/m3 Waste water plant capacity 50000 PE.

